Page 25 - Triwatt Custom Lead Amp Builder's Guide
P. 25
Install the two dual capacitor can caps using the bracket to hold it in place.
Insert the 5 grommets for wire leads passing through the chassis from the power transformer and
output transformer.
The front panel is installed and held in place by installing the pilot light, power switches,
potentiometers and jacks. Ensure the potentiometers are located in the correct positions according
to their values and the layout. There are locating holes cut into the chassis for the potentiometers,
so they won’t spin if the control ever loosens. For the jacks you probably will need only 1 fiber
washer on the inside to mount them flush with the front panel.
TRIWATT Front View
If supplied, the rear panel is installed and held in place by installing the IEC mains connector,
Mains strain relief, fuse holder, output jacks and possibly an impedance selector.
TRIWATT Rear
TrinityAmps TRIWATT Builders Guide Ver. 2.31.docx- 25 -